[1]
2012. The Two-machine Flow-shop Scheduling Problem with a Single Server and Unit Server Times. Journal of Informatics and Mathematical Sciences. 4, 1 (Apr. 2012), 123–127. DOI:https://doi.org/10.26713/jims.v4i1.74.